User no longer wants to use project control and wants to remove all the assignments in BillQuick.
This can be accomplished by going to Project Control selecting the Tools drop-down menu and then the 'Copy To' setting. This will open the Copy Project Control tool.
We suggest you either create a blank project or choose a project with no assignments and then use the Copy Project Control tool to copy from the selected project to the Project Group 'ALL'
***Please use caution when performing an operation like this as there is no undo option and this can be a very time and resource consuming process depending on the size of your database and the number of assignments that have been made. A full database backup should be taken before beginning. Also, please do not perform this operation when others are using the application.